Which sailing can still meet the delivery window?
Use terminal acceptance and the receiving deadline to choose a booking.
The question
On Tuesday you coordinate a fictional export shipment from an Indian port. The customer needs the container at its dock by Thursday 12:00. You may approve up to ₹50,000 in extra cost for a confirmed recovery. All times use the dispatch time zone.
- VesselScheduled departure: Tuesday 21:00.
- TerminalThe terminal accepts completed gate-in through 17:00. Gate-in means the terminal has accepted the container.
- TruckEstimated arrival: 16:25. Allow 25 minutes more for the gate-in to finish. Documents are ready.
“Can you use the booked sailing? If it falls through, choose a recovery that meets the customer’s window.”
Not saved by this site. Your browser may restore text when you navigate back.
A strong answer, step by step
Open each step in turn. This is one strong answer, not the only one.
Step 1: Which time controls terminal acceptance?
What would you do here? Open the move you’d make.
Use the scheduled 21:00 vessel departure as the truck deadline.
Tempting, but it misses something. The terminal closes acceptance for this booking earlier.
Compare the gate-in completion time with the cutoff.
The strong move. This tests when the container can be accepted.
Use truck arrival as proof of acceptance.
Tempting, but it misses something. The packet gives another 25 minutes to complete gate-in.
See how a strong candidate says it
“Use the completed gate-in deadline. Allow time to finish gate-in after the truck arrives. The scheduled departure is a later event.”
Why it works: The truck has to meet the terminal’s acceptance window to use this booking.
Step 2: Does the original trip fit?
What would you do here? Open the move you’d make.
Proceed on the estimate and track the terminal’s receipt.
The strong move. The estimate fits and you still need completed gate-in.
Count the time from 16:25 to 21:00 as gate buffer.
Tempting, but it misses something. The window ends at 17:00 in the opening booking.
Assume ready documents mean completed gate-in.
Tempting, but it misses something. The terminal still has to accept the container.
See how a strong candidate says it
“Arrival at 16:25 plus 25 minutes gives 16:50. That is 10 minutes before the 17:00 cutoff. Confirm the window and track actual acceptance.”
Why it works: The opening estimate fits with ten minutes to spare.
Step 3: Which booking can still work?
The original gate-in cutoff moves to 16:30 with no exception. Tomorrow’s sailing adds ₹16,000 storage and ₹4,000 booking, with delivery estimated Thursday 14:00. An alternate has confirmed space today. Its terminal estimates gate-in at 17:10 against a 17:30 cutoff and delivery Thursday 10:30. Total extra cost is ₹46,000.
What would you do here? Open the move you’d make.
Wait for tomorrow’s lower-cost sailing.
Tempting, but it misses something. The Thursday 14:00 estimate misses the noon deadline.
Keep the original booking because the vessel still departs at 21:00.
Tempting, but it misses something. The terminal has confirmed the 16:30 cutoff and will give no exception.
Book the confirmed alternate and track gate-in.
The strong move. It has a 20-minute gate buffer and a Thursday delivery estimate 90 minutes before the deadline.
See how a strong candidate says it
“The original trip misses the new cutoff by 20 minutes. Tomorrow’s sailing misses the dock deadline by 2 hours. The alternate costs ₹46,000, or ₹26,000 more than waiting, and meets both windows on the estimates.”
Why it works: The alternate has confirmed space and the extra cost is within the stated authority.
Step 4: What would you tell the teams?
What would you do here? Open the move you’d make.
Tell the customer the original sailing will still work.
Tempting, but it misses something. The original cutoff is already outside the truck’s estimate.
Share the new booking and report gate-in and delivery as estimates until verified.
The strong move. This gives the teams a plan and a check on each event.
Confirm delivery at 10:30 as soon as the carrier accepts the booking.
Tempting, but it misses something. The confirmed space still leaves the gate-in and delivery ahead.
See how a strong candidate says it
“Share the new booking, terminal and gate-in estimate with dispatch. Assign someone to verify acceptance. Give the customer the Thursday 10:30 estimate and record the added cost for the account owner.”
Why it works: The dispatch team needs the route and acceptance check. The customer needs the updated receiving estimate.
The answer, in short
- Decision
- Book the alternate and verify terminal acceptance.
- Because
- It is the feasible option in the packet that meets the cutoff, dock window and cost limit.
- What would change it
- A verified change to the cutoff, dock deadline or available space.
Common traps
- Using sailing time as the gate cutoff.
- Choosing the cheapest recovery without checking delivery time.
Check your answer
- When will gate-in complete?
- Which cutoff is current?
- What does the recovery cost?
- Who confirms acceptance?